Royal Perak Golf Club
Royal Perak Golf Club began as Ipoh Golf Club (IGC), a humble nine-hole course on the Race Course, before the turn of the last Century. In 1932, as a result of the growing membership, 180 acres of land were acquired along the then Tiger Lane to construct an 18-hole golf course, and a new improved clubhouse added.
Tough Competition from Philips Lighting and Job Completed in Mac 2008 worth over RM 50,000.
We achieved this project with a swooping advantage over Philips; with GEWISS, we require 16 nos. floodlights while Philips requires 32 nos. of floodlight.
Advantage: lesser cost of installation, maintenance & energy consumptions
Mr. Lau Kean Yi & Mr. Teh Kok Lin busy are preparing the laser aiming unit to start the installation. The laser aiming unit was the use to aim & adjust the floodlights to the desire location.
This is an added advantage that the lights aiming can be done in broad daylight.
The floodlights control gear installed at the feeder pillar which located at the base of the mast. This control gear can be located up to 80m away from the lantern.
Floodlight beam in action.
After installation, the on-site measurement is needed to confirm the reading as per proposed. Mr. Sunny Low, Mr Lau Kean Yi & Mr. Teh Kok Lin busily taking measurement and recording data in the area of 256m x 196m. At the end, all our hard works paid as the results was far more better that anticipated.
This picture is taken at the top of the mast 12m above ground.
This is the results after a long 6 hours work!
Uniformity… is where the light levels are adequate and uniform throughout the area.
Here GEWISS floodlights achieve more than 30% compare to simulated result at 6% only.
Average lux achieved more than 60 lux (simulated 36 lux only)
GEWISS floodlights in ACTION!
Other similar references:
1.Royal Johor Country Club, Johor Bahru
2.Sri Klebang Recreational Club, Ipoh