Port of Tanjung Pelepas (Phase 2- Back of Wharf)
Port of Tanjung Pelepas (PTP), Malaysia’s largest container port, is a world-class port strategically located at the southern tip of the Malaysian peninsula and at the confluence of the busy east-west trade lanes passing through the straights of Malacca. PTP’s strategic location makes it an ideal gateway port for the region to the larger Asean (Association of South-East Nations) and Asia-Pacific markets.
.jpg)
Gewiss high efficiency ZNT light to illuminate the cranes for the nightshift operations.
Workers busily preparing & installing the floodlights on the mast which was completed in record time of 5 working days as compare to conventional installations which will require 3 weeks for completion.
Thanks to the innovative of GEWISS Laser Aiming Device and WIELAND RST connectors which helps to reduce the installation time.
Installation was done at the berth 9 & 10 new berthing area for LARGE container vessels.
Total of 6 high masts with the height over 45m and the total GEWISS floodlights installed were 112 nos.
GEWISS Floodlight was chosen based on the built quality and the high efficiency that was able to produce. In additional, GEWISS able to provide unaided accessories to prevent GLARES which is HIGH IMPORTANCE in PORT OPERATION.
.jpg)
IA busiest manager was there for “LOOK SEE LOOK SEE”
Fully operational! This picture was taken after more than 1 year in service.
Aiming of each floodlight is critical and stringent specifications of getting lighting levels of international standards.
When the night fall the collesuem floodlights were used for britghten up the bert at night for keeping the cargo on the move. The Gewiss lighting system, which not only eliminated the shadow of containers, but also gave high illumination level with appropriate uniformity.
The Gewiss ZNT was chosen thank to its superbright diffuser and watertight enclosure protection.
Pelabuhan Tanjung Pelepas (phase 2 extension – Container Yard)
Project started in February and estimated completion in August 2008. This time, the project was above RM 130 million package including REEFER STACKS, CONTAINER YARDS, SUBSTATION, etc.For this time, we secure 2 packages:
Installation of 66 nos. GEWISS Colosseum floodlights to replacing existing HIGH MAST Floodlights in Berth 7 & 8
Installation of 440 sets of GEWISS ZNT watertight light fittings to the newly built reefer stacks.
A total of 2x 10 rows of reefer stacks 5-storey mega metal structure (which is use to supply power to Refrigerated Containers) to use GEWISS ZNT.
Installed and well positioned in the walkway areas.
This time, ZNT was installed with the latest newly developed mounting kits from GEWISS which helps to simplified and ease the installations.
In addition, the maintenance were made even more easier.
This picture was taken just minutes before 2-hour thunderstorm strikes PTP which heavy rain and strong winds blowing. Here you could see the rain clouds circling PTP from Singapore and back to PTP…
Alignment and Positioning of the floodlights in the high mast
END RESULTS…after heavy thunderstorm, all ZNT were checked for water ingress and FOUND NONE…GEWISS has proven that ZNT could well able to withstand such rough unpredictable environment.